Wednesday, 26 September 2018

Like a scene from "the Scottish Play"

Tuesday, 25th September.

Act 1, Scene 1.  A desert place

(Thunder and lightning.  Enter three witches.)

First witch       When shall we three meet again

                         In thunder, lightning, or in rain?


Well, I don't know about three witches, an aged hag and his familiar perhaps!  We knew it would rain first thing - and so it did; but not so much that I couldn't get out to fit the font door.  The width I managed quite well; the top and bottom were a different matter and I rather savaged the sawing of them.  Hmm.


And then it was time to heave the winter wheels out of the barn, load them into the van and head off to Marcel at SOS Mecano to have them fitted.  He's selling up so it will be the last time that he does this for us.  He was in no mood to rush; he wanted to show me the transit van that he's converting to a dormobile so that he and his wife can "Be free".  He's had enough of the garage, and so has his wife; he agreed to sell it to two young relatives 9 months ago.  It has taken them that long to have the loan agreed.  So he took his time, chatted, balanced the winter wheels assiduously, pressure hosed them down, pressure hosed the summer wheels and loaded them in to the van for me.  I shall miss him and hope that we can keep in some sort of touch once he's retired.

Once home, I returned to the fray with the door but then the rain really came down for a while and so we took to internal chores; stowing some of the camping gear for a start!

After supper and with a tarpaulin suitably arranged around the south end of the building, rather like a bather trying to keep their modesty whilst changing on the beach, we fitted the third window from the inside.

Bed was very welcome.

Wednesday, 26th September.





A snatched photo - rain again and thunderstorms forecast.  Off to St Jovite to watch Denis' new house being delivered as well as to return some goods to Rona - an unwanted bale of insulation and two large, angled "Noue" (strips of galvanised steel) which won't do what we hoped they might.

But when we arrived, Denis' off-site house prefabricators had already rung him to delay the delivery because of the impending rain.  I shall have to ask Karen (who is due home from Alberta tomorrow) to take plenty of pictures on Monday when it is finally due to be delivered.




The weather, once we got home, did worsen for a while, and there were one or two big gusts of wind, but essentially, a cold front passed over with its main weight further south.  Not the catastrophe delivered to Ottawa earlier.





Most of the south end is now clad with its finish.  It's 8.30 pm  - we're just contemplating whether to go out to fix the last window.......






So we did and, despite the Measuring (not to be confused with the foldin' of the arms and the tappin' o' the feets [pace Terry Pratchet]) or even regardless of it, the window glass didn't fit.  By about 2mm in one corner.  This is is the South West corner which we think has settled a fraction.  It gave us grief earlier in one way or another.  So there was nothing for it but to make the window frame fit the glass; wood is generally easier to adjust than glass is.  Especially when the glass has a bonded edging.......

So there we are; four windows in.

Just the door, the front eaves, the cladding and the roof to go.  Two fair days forecast; cross everything.  It's midnight!