Sunday, 14 August 2016

Ups and downs - mostly ups!

Saturday, 13th August.  Out fairly early to buy timber for Jeremy and Lucas to make a pair of canoe-stands; and to reinforce mine, too.  It has tended to lean in towards the middle when weighted! 


Making the stands (of which the lads were justifiably proud!) took  until about lunch-time;



at which point we returned from a generous but light collection of humus and pitta and all things middle-Eastern to start on the fiddly, messy and generally horrible job of glassing the bow and stern tanks on both boats.  I hate fibre-glassing!

which left us with the main inner hulls to do either side of a rather late supper.



Setting up for which we found ourselves very tight for fibre-glass and, finishing which (a centre section on each boat only), we decided that we were too short for resin to continue and very tight for fabric anyway.

A message left on web-sites overnight confirmed that ordering more of our particular resin, next-day delivery, was the way to go.  We shall add some more cloth  to the order......



BUT, Sunday, 14th August was a very GOOD day.  Rachael was up early to the shops!  We left by 09.45 to go to church where baby Olivia was Christened.  It was a very moving service, led by Nick Pang.  Two things struck me; this sentence after the signing with the oil...




And the reading in French buy Olivia's Mum and in English by her Dad, of a letter they have been asked to write to her, to find in the future, explaining to her what they will become of their decision to have her baptised. 

Lovely, slightly gooey, family words but showing an insight and reverence that many families don't show.






Back home, gunwales dry fitted and beginning the process of making the decks.  We're having to recess the inwales to accept the decks lower than the outwales.














Beckie is learning to use a spokeshave and a chisel; Lucas is deeply useful measuring and clamping and cutting out!



Friday, 12 August 2016

Master of none!

Thursday, 11th of August.  The overnight tiling had set; I popped down to Claude's to borrow a tile cutter / electric tile saw. 
He was packing up to head off to the Gaspe for a week; fishing!  The saw was just magical!

But I got rather messy with the back-splash......


So, the rest of the tiles were in place by lunch-time.  I had a bit of a sit-down (it was super hot again) and then I went out to cut the front lawn whilst the first outwale for V2 steamed away, and I got rather hot and bothered as well.

But happy!

I have drunk so much liquid today; sadly, I've run out of calorie-free and so have been reduced to Spruce Beer.  Strange tasting stuff (someone has to drink it, right?) and lots of calories.  Still.  I have been working hard.....

Back to grout the tiles and re-install the loo.  Seems stable!  And looks OK too.  Left-over tiles from the previous owner.  WNWN!  Re-installed the baseboard heater in the bathroom.  Up off the floor and away from the loo!  Just have to clean the place tomorrow and it will be fit for visitors - if the water works of course!

Grabbed some supper and then back to the boatyard / basement to steam and bend the last outwale for V1.

As I mailed the Vermontians earlier.  "About 3 hours behind where I wanted to be in a perfect world, but ostensibly "There".      Looking forward to seeing you all."

And I am!

Burlesque needs attention.....

Hugely noisy rain overnight!  The heat has broken - at least, for now!

Today, Friday, 12th August.  Up early to get to grips with cleaning the house (Shhhhh!), the cabin and myself! 

All was going well until I heard from Ali that her flight was delayed; in the end it was late by 2 hours and 20 minutes!  I fitted in a trip to the tip (they weigh you in, send you to the recycling centre or where ever - really pleasant chaps at both - and then weigh you out and calculate the fee.  Mine today?  "Gratuite"!  Too light to measure), and then to IGA for shopping - wildly resisting made cakes contemplated on the basis that the visitors would like them - and Rona for screws for the Vermont boats... 

I was intending to buy timber for new boat cradles but the queue was silly long and I worried about getting to the airport to meet Ali.  In the end, her flight was even later than called so I needn't have worried; but hey, it was very good to see her.  Very good.

Final bed-making in the Cabin, beds made up in the main house.  Just waiting for our visitors now :-)

Wednesday, 10 August 2016

All work and (almost) no pictures!

But happy work!

It just seems to take a long time, that's all.

Tuesday, 9th August.  Up fairly early after a poor night's sleep to put a coat of paint on Burlesque and then to get going on V1. 

Which took until about 11.00 pm  When I had a text Chat with Ali, after which I fell asleep on the settee and went to bed at about 2.00 am.  Idiot!

Today, Wednesday, 10th August,  was a "No boats" day.  I have to tile the platform under the loo in the Cabin.  Which I have mostly done!  It was hard work sawing out the curve around the out-pipe, especially when the saw broke 5/8 of the way through the job!

I need to borrow a tile-cutter tomorrow to do the edges!

On the way up from the barn - the quad bike is sick; I need to fix the brakes! - this little chap toughed it out.  Well, nearly toughed it out!


Michel came for supper and we put the world to rights until just now!

Fun!

Monday, 8 August 2016

Après le déluge

...  Moi!

Sunday, 7th August.

Too short a night for a 7.00 am start.  The sun was low and in my eyes as we set off to St Saveur - leading worship again!  So Ali drove, thankfully.

We picked up packed lunch before service - which was complemented on (but a change is ....., Eh?!).  Fortunately, Ali came in to the vestry before we began, to tell me that the organist had decided on different hymns.  Just like that.  In fact, I had been told that this sometimes happens but still; just as well I wasn't using a line from one of them as my text!

On to Morin Heights for round two.  The same organist, the same changes.  Unrepentant!  Ho hum.



The weather was warming up and the cassock, better suited for chilly, English gravesides, needed airing in the car on the way to the Grace Church Parish Pic-nic at Arundel! 

Great fun, lovely people.  Wanda's place is a beautiful, old but restored 1920's farm house, lined with Western cedar strips.  Not a knot in sight.




Mind, the privy was interesting.....






We came home via L & A to return her phone - the house was asleep and so, nearly, were we so we didn't stay.  

As we drove in, this lovely doe was there to greet us - and in no hurry to be gone!


We were shattered; I think that we both fell asleep on the settee / floor.





A light supper revived us after a fashion and Ali joined the Olympic coverage whilst I went to steam the second intwale on Vermont 2!




Monday, 8th August.  A more leisurely day - of sorts.

The blue jays have discovered the feeder....









This guy is still in evidence.....




And I moved V 2 onto the rack in order to begin V 1!

Wire-holes filled, stems filleted.

Tomorrow I intend to give poor, neglected Burlesque a coat of paint and to begin the mammoth task of bending the inwales and the outwales of V 1!




 But how, I hear you ask, I am free to do all this?  Are there not wifely-dictated duties to carry out?






Well, yes; the lawns, clearing the cabin for visitors, putting the laundry in the tumble-drier (done that already!)...

But Ali has deserted me; fled to Toronto on Granny duties.  Her plane flew right over the lake here and Guy was there at Billy Bishop to meet her.

Sob!

(Now - where did I put the Dom Perignan........)







Saturday, 6 August 2016

Blink - and you'll miss it!

Thursday, 4th August.  Off early to the village - well, to Mark Goldman's wonderfully equipped workshop actually - to make the first cuts on the inwales for the Vermont boats.

The plan is to taper the ends of the inwales so as to make the steam-bending easier and to give a more aesthetically pleasing line to the wood!

The blue rectangle is the initial, 16ft long by 7/8 inch (this is Canada - none of your metric stuff here, Eh!?) square oak.

The cuts at each end take off a 1/4 of an inch - 2/8ths.  I then plane a smooth line from about 6 inches (Hush at the back!) central to the ends of the cuts on to the flats - by bending the ends downwards and effectively planing the outside of a curve!

Then I steamed and bent the first inwale in to the curve.  Easy!  Er, not actually, but straightforward anyway and a GREAT deal easier than when we steamed the gunwales for MarRon all those years ago!

But that was later;  on Thursday I just went to make the cuts and came home.  Later in the afternoon, Ali joined her UK book-club by Skype.  She has been reading - for the third time - a book called The Goldfinch and she really wanted to join the discussion.  She must have been linked in for 3/4 of an hour and loved it - and the book!
And then Lorne and Audrey came for a lovely, straggling, chatty supper in the screen room.  Rhubarb crumble :-)

Then I don't remember quite when - it's been an eventful 36 hours since!  - at some point, Gilles came to let me know that the second Quad inner tube, which I had paid for and collected at some point in the proceedings, had not in fact been fitted.  By Friday lunchtime, 5th August, I had been to the garage - again - and now had my battery, finally properly identified and filled with acid, and my second, tubed tyre.  And I brought the quad home - to everyone's relief.

Friday afternoon I began steaming the inwale and got that two thirds fitted and clamped.  And decided to call it quits for the evening and to get to grips with the sermon for Sunday.  And the most enormous thunderstorm arrived and banged and crashed and the rain "came down in torrents"!  And the lights went out.  And stayed out.

And so we dug out the camping gear and fought with corroded batteries (funny that, I NEVER leave batteries in things long term - only I do :-(  ) and got the Trangia stove out and set ourselves up for the evening without e-readers or the internet.

 

It was an early and broken night, very hot and humid but cooler by the morning.  

Saturday, 6th of August.  Still no power at breakfast so coffee by the Trangia and in the cafetière and then serious efforts to get the frozen food safe.  All around us the houses hummed - or clattered, or rattled depending on the age - with the sound of portable generators.  Claire had room in her freezer and water from the lake for us to use to flush the loos..... 

And I went in to the village to buy more batteries - in case things lasted longer still, to fill up the municipal source water bottles and to buy canned soups to replenish our emergency stocks.


And on the way, I was met with this - a traffic jam!

We NEVER have traffic jams.  Only this time it was because Hydro Quebec (electricity company)  were clearing a fallen tree from across the road - where it had cut a power line.




And things got worse closer to the village centre....


The saddest being the demise of the remaining fir outside the church.  There had been two until last year when safety concerns demanded the removal of one.  Now they're both gone.


I sat outside the boulangerie supping my cafe au lait and eating my pain au chocolat (you have to spend $5.00 in order to get the free wi-fi) transferring my sermon to the Kindle, just in case, and letting the wider family know that we were out of communication but OK.

But the rest of the day was wonderfully productive.  The power came back at about lunch-time I think.  There were lovely emails from a number of people.  We replaced the snow-bent roof glazing bars on the screen room, brought the cedar canvas boat up to from the barn so that I can see to paint it in a bug-free zone; I finished bending the first inwale to Vermont boat 2; I Skype-texted with Ginny, getting ready for camp, Ali chatted to Bryony later.  And then we had that firm favourite, cauliflower cheese (only made with cream, I'd forgotten to buy more milk!) for supper before I fought the printer and assembled the materials for the services tomorrow.

And now time for you, dear Reader.  I hope that you slept well; I intend to, very soon.

Wednesday, 3 August 2016

Fish and Chips and fillets generally!

Apparently, Lila talked of "fishing" all the way home to Toronto.  All nine hours of it!

Tuesday, 2nd August.  Sorry Lila, darling; it had to happen didn't it?

Advice from M. Bruneau.  Bass - Green Popper on a fly rod.  14.4 ounces.  One of three........

Oh well, next time, eh!

Otherwise, a pretty quiet day.  Some planning and scheming over the Vermont boats - how shall we make the decks?  And the discovery - after hours of fruitless searching, of the fittings bought last year!.    “When people say "it's always the last place you look". Of course it is. Why would you keep looking after you've found it?” - Billy Connolly  - priceless!

Wednesday, 3rd August.  A day in waiting.  The washing-machine repair man was due to come today.  We had all sorts of other stuff that needed doing but we just waited.  Eventually, at 6.30pm, we fired off a pretty vexed email to HQ.  He turned up at 7.15.  It's the summer; work ends when the job's done.  I should have remembered.

But being tied to the house meant that we got some constructive bits done; 

progress on the Vermont boats; progress on our new head-board.

And, at the end of the day, one for the Pedlar's Pack, Fish and Chips, Laurentian style! 

Bass; caught, cleaned, filletted, cooked, eaten.

Yum!


 


Monday, 1 August 2016

Cottage Country!

Sunday, 31st July.

It's obvious, isn't it?  When a young lady has expressed an interest in canoeing, she just has to have a paddle!  So Guy and I set about making this little paddle for Lila, fairly early on Saturday morning!

Not the most classic shape perhaps, nor yet the perfect size-match, but her first, very own paddle.  It's a piece of tamarack (larch) that I've had for a year, just waiting....  Super light; just right!





And it meant that she could go paddling with Daddy and Granny (and the photographer ;-).

Perfick - as Pa Larkin would have said.

But we couldn't leave this chap out of the fun, could we?  A lovely afternoon, and a lovely supper in the North American style (BBQ ribs and a very cunning hot dog (no buns, so a slice of bread, flattened by the bottle/rolling pin and wrapped - with our dwindling supply of Tommy K - around the sausage))!

Yum!
















After that culinary effort, the chef took to the water - ostensibly to put the boats away, but also to record this Sunday evening idyll.  Owners gone back to the City.....


















And look!  Ali's grass has sprouted!












Monday, 1st of August.

I got pinched and punched!  And we woke at a much better time!

Ali led a raspberry hunt in to the top meadow - rapidly becoming the raspberry patch and Christmas tree plantation!  Apparently many raspberries of fine and excellent flavour were found; none survived to prove the fact!

Guy, Lila and I went for a last paddle here for this year; lunch and then away!  Very sad - a big hole gapes in the life of this place.

So - back to the basement; displacement therapy, at least for me.

Of interest - the left hand image is of the outwhale steamed by the traditional - box (or pipe) - method.  The right hand image was steamed "boil in the bag"!

Can you tell the difference?






And then, a benison - a little shaft of sunlight at the end of the day.



Thanks for coming kids - loved it!